TestIT:Guide

From Nolek Wiki
Revision as of 14:19, 19 August 2019 by NolekAdmin (talk | contribs)
Jump to navigation Jump to search

9. Guide

Guide

The guide service allows you to see the guide in setup. In the first section, a guide workflow is shown.

An overview of the guide:

Options:

  • TestIT Home button Home - go back to the home page
  • Add guide Add guide - add a new guide


9.1 Guide workflow

The figure below shows the general guide workflow.


Explanation of the steps:

Steps
START Starting a guide can be done in two ways;
- Internal
- External
GUIDE STEP There are different types of guide steps
OK The OK step can be any step in the guide.
The action can be:
- OK button pressed
- OK I/O set
NOK The NOK step can be any step in the guide.
The action can be:
- NOK button pressed
- NOK I/O set
- Next validation fails
BACK The back step can be any step in the guide. The action will be a Back button pressed.
GUIDE STEP (last) The OK of the last guide step, depends on which guide is running.
- Internal is going to close after the last step. Set the OK step to a guide number, NOT in the guide.
- External is going to start over after the last step. Set the OK step to the appropriate guide step.
- External is going to close after the last step. Set the OK step to a guide which tells the user to close the guide.

9.1.1 Guide step flow

The figure shows an overview of a guide step flow, like where the validation of the workflow is: TestIT:9guide:930.png?direct&300

__Explanation of the flow:__ | INIT VALIDATION | Before opening the guide step, the init validation is running. \\ - If the validation is OK, the guide step will open \\ - If the validation is not ok, the init validation NOK step will be opened | | GUIDE STEP | The actual guide step is opened | | RELEASE VALIDATION | The release validation is running while the step is open. \\ - If the validation is OK, the OK button will be released \\ - If a next release I/O is selected, it will be set on validation OK \\ - If a validation success message is set, this will be shown on validation OK | | NEXT VALIDATION | If OK button is pressed or OK I/O set, the next validation will be running \\ - If a timer is set, it will start \\ \\ - If the validation is OK, the next guide step will open \\ - If not, the validation will keep running for the timeout period \\ \\ - If the timeout runs out, the timeout message will be shown or the timeout step will be opened |


9.2 Add guide

9.3 The guides

9.4 How to run a guide

9.5 Guide steps