Difference between revisions of "TestIT:Guide"
Jump to navigation
Jump to search
NolekAdmin (talk | contribs) |
NolekAdmin (talk | contribs) |
||
Line 50: | Line 50: | ||
|} | |} | ||
− | + | ===9.1.1 Guide step flow=== | |
The figure shows an overview of a guide step flow, like where the validation of the workflow is: | The figure shows an overview of a guide step flow, like where the validation of the workflow is: | ||
− | |||
− | + | <gallery> | |
− | | INIT VALIDATION | Before opening the guide step, the init validation is running. | + | File:testit_guide_workflow_pic2.png|Guide step flow |
− | | GUIDE STEP | The actual guide step is opened | | + | </gallery> |
− | | RELEASE VALIDATION | The release validation is running while the step is open. | + | |
− | | NEXT VALIDATION | If OK button is pressed or OK I/O set, the next validation will be running | + | '''Explanation of the flow:''' |
+ | |||
+ | {| class="wikitable" | ||
+ | !colspan="2"|Flow | ||
+ | |- | ||
+ | |INIT VALIDATION | ||
+ | |Before opening the guide step, the init validation is running. <br> - If the validation is OK, the guide step will open <br> - If the validation is not ok, the init validation NOK step will be opened | ||
+ | |- | ||
+ | |GUIDE STEP | ||
+ | |The actual guide step is opened | ||
+ | |- | ||
+ | |RELEASE VALIDATION | ||
+ | |The release validation is running while the step is open. <br> - If the validation is OK, the OK button will be released <br> - If a next release I/O is selected, it will be set on validation OK <br> - If a validation success message is set, this will be shown on validation OK | ||
+ | |- | ||
+ | |NEXT VALIDATION | ||
+ | |If OK button is pressed or OK I/O set, the next validation will be running <br> - If a timer is set, it will start <br><br> - If the validation is OK, the next guide step will open <br> - If not, the validation will keep running for the timeout period <br><br> - If the timeout runs out, the timeout message will be shown or the timeout step will be opened | ||
+ | |- | ||
+ | |} | ||
Revision as of 14:26, 19 August 2019
Contents
9. Guide
The guide service allows you to see the guide in setup. In the first section, a guide workflow is shown.
An overview of the guide:
Options:
9.1 Guide workflow
The figure below shows the general guide workflow.
Explanation of the steps:
Steps | |
---|---|
START | Starting a guide can be done in two ways; - Internal - External |
GUIDE STEP | There are different types of guide steps |
OK | The OK step can be any step in the guide. The action can be: - OK button pressed - OK I/O set |
NOK | The NOK step can be any step in the guide. The action can be: - NOK button pressed - NOK I/O set - Next validation fails |
BACK | The back step can be any step in the guide. The action will be a Back button pressed. |
GUIDE STEP (last) | The OK of the last guide step, depends on which guide is running. - Internal is going to close after the last step. Set the OK step to a guide number, NOT in the guide. - External is going to start over after the last step. Set the OK step to the appropriate guide step. - External is going to close after the last step. Set the OK step to a guide which tells the user to close the guide. |
9.1.1 Guide step flow
The figure shows an overview of a guide step flow, like where the validation of the workflow is:
Explanation of the flow:
Flow | |
---|---|
INIT VALIDATION | Before opening the guide step, the init validation is running. - If the validation is OK, the guide step will open - If the validation is not ok, the init validation NOK step will be opened |
GUIDE STEP | The actual guide step is opened |
RELEASE VALIDATION | The release validation is running while the step is open. - If the validation is OK, the OK button will be released - If a next release I/O is selected, it will be set on validation OK - If a validation success message is set, this will be shown on validation OK |
NEXT VALIDATION | If OK button is pressed or OK I/O set, the next validation will be running - If a timer is set, it will start - If the validation is OK, the next guide step will open - If not, the validation will keep running for the timeout period - If the timeout runs out, the timeout message will be shown or the timeout step will be opened |